HOPE-Energy Subcommittee-Advanced cases inspection

HOPE Energy Subcommittee Feb 7,2014(Fri), Feb 8(Sat)of two days Tochigi and Chiba three points of the inspection.
The first day was fair condition but second day was among unusual the heavy snow condition、JASFA member NEOSYSTEM 、Tokyo Solar Building Materials Corp、Bush Clover Community, Arc Japan, Mabuchi Enginnering, total 5 company 8 peoples attend 、it was very meaningful and memorable inspection.

Inspection Overview
・The first day
1) Nasu Karasuyama city Nanago Junior high school Photovoltaic power generation
Visual Vision (Nakayama 226, Nasukarasuyama-city, Tochigi-Prefecture)
hope-en-photo-140207024_R.JPG
hope-en-photo-140207013_R.JPG

hope-en-photo-140207061_R.JPG
Adopted a portable battery charging system of compact and lightweightTo enhance the convenience of an emergency use.

・The second day
2)Sustainable Village Dotaro
(Dotaro886-1 Takataki, Ichihara, Chiba)

hope-en-photo-140208001_R.JPG

 

 

 

 

 

 

 

 

Without agreement with the power company, Utilizing the power storage system such as natural energy and photovoltaic generation.

3)Sammu-city Farmland solar.
ALBA TECH (Toda1185 Sammu-city Chiba Prefecture)
hope-en-photo-140208030_R.JPG

 

 

 

 

 

 

 

 

Low cost, warranty, Maintenance ,Easy-to-deploy products and packages.

ログイン

Archives

Top